Installation was performed by specialists of TİTAN2 IC İÇTAŞ İNŞAAT ANONİM ŞİRKETİ, a Russian and Turkish joint venture.

Currently, the company’s specialists continue the installation of the power output system that will allow to safely commission Unit 6 (Power Unit 2 of the LNPP 2) into commercial operation this March.

Students started working at facilities of the company in Leningrad, Kaliningrad, and Tomsk Oblasts.

JSC CONCERN TITAN-2 is the main contractor of the project.

Works are performed by specialists of the hydraulic structures project of TİTAN2 IC İÇTAŞ İNŞAAT ANONİM ŞİRKETİ, a joint Russian and Turkish venture.

Installation was performed by workers of the lifting mechanisms site of TİTAN2 IC İÇTAŞ İNŞAAT ANONİM ŞİRKETİ, a Russian and Turkish joint venture, and by those of TSM (MSU-90). The weight of equipment was around 150 tonnes.

Works are performed by specialists of TİTAN2 IC İÇTAŞ İNŞAAT ANONİM ŞİRKETİ, a Russian and Turkish joint venture.

Within its scope, a power unit is being built for the Pilot Demonstration Power Complex on the premises of Siberian Chemical Combine.

Video news