Newsfeed
- Details
The central hall slabs are currently being concreted at elevation +26.000, as well as the reactor cavity, where the reactor vessel of more than 300 tons will soon be installed.
- Details
The central hall slabs are currently being concreted at elevation +26.000, as well as the reactor cavity, where the reactor vessel of more than 300 tons will soon be installed.