The summer period is the main peak load: builders will have to test two tanks for storing petroleum products in Dudinka. The mass of each of them is 5,000 m3. After all tests, the tanks will be painted and put into operation. Similar work is to be carried out in the village of Tukhard, where CONCERN TITAN-2 is installing a new vertical steel tank with a capacity of 1000 m3.

Recently, one of two concrete plants began operating at the reconstruction site in Dudinka. It produced the first batch of concrete in June of this year. The design capacity of the new plant is 100 cubic meters per hour. The second plant is located in the Old Town of Norilsk, the commissioning of which is scheduled for July this year.

In addition, specialists from CONCERN TITAN-2 will install a batch of river standers at the berths of TTK JSC in Dudinka. These are special devices for carrying out loading and unloading operations with liquid products. In the future, they will be used to transship jet fuel, two types of gasoline and diesel fuel.

By the end of summer, it is planned to complete the automatic feed station (AFS) and the railway overpass at the Dudinskaya oil depot. A railway overpass and an automatic feed station will also be completed at the oil depot in Norilsk.

CONCERN TITAN-2 separate subdivision is also working to complete the first stage of construction of the forging and thermal shop of the Mechanical Plant. The holding's specialists have already carried out internal renovations of the building there and replaced the roof. There are still workshop facade plastering and painting to be performed.

For information:

The TITAN-2 Holding is a Russian group of companies that builds nuclear facilities. Organisations of the Holding perform the whole cycle of works, from development of basic design documentation to facility commissioning.

The TITAN-2 Holding is the general contractor for construction of the new power units of the Leningrad NPP. At the construction site, the organisations of the Holding perform all civil construction, installation, and electric installation works.

The Holding participates in the construction of Akkuyu NPP in Turkey, Paks II NPP in Hungary and El-Dabaa NPP in Egypt.