Taimyr Fuel Company (TTK) acts as the Customer of the works.
The company’s stand-alone subdivision specialists are carrying out the works at the Norilsk, Kayerkan and Dudinka oil depots.
This year, the company specialists have to complete the reconstruction of the railway trestles at the Dudinka, Kayerkan and Norilsk oil depots and build two automated filling stations.
The completion of the construction of two oil product tanks with a capacity of 2000 liters each, is now in progress at the Dudinka oil depot. Four tanks will be built at the Norilsk oil depot. This works started in 2022 and a part of them has been completed by 85-90% while the rest is in progress.
Another stage of the works is the reconstruction of the sea and river terminal of the Dudinka sea port where the loading arms will be installed. They are self-supported utility systems designed for loading oil, oil products and various chemical substances into river or sea oil tankers. JSC CONCERN TITAN-2 specialists indicate that these are the modern systems that will replace the old hose-type ones. The loading arms are environmentally-friendly and reliable installations capable of automatic shutdown of the oil products supply in case of rupture.
For information:
The TITAN-2 Holding is a Russian group of companies that builds nuclear facilities. Organisations of the Holding perform the whole cycle of works, from development of basic design documentation to facility commissioning.
The TITAN-2 Holding is the general contractor for construction of the new power units of the Leningrad NPP. At the construction site, the organisations of the Holding perform all civil construction, installation, and electric installation works.
The Holding participates in the construction of Akkuyu NPP in Turkey, Paks II NPP in Hungary and El-Dabaa NPP in Egypt.