In future, these tracks will be used for transportation of large-size equipment.

Most part of works has already been done. Installation of tracks at the turbine building of the second power unit has been recently finished. After installation of tracks, they were tested by means of a special trolley. Afterwards the specialists carried out geodetic works for alignment and additional tamping of track and tie lattice. Then the structure was reinforced with concrete.

These tracks will be soon used for transportation of large-size equipment – transformers weighing 320 tons.

Currently, specialists of the sector of construction and installation works no. 6 of JSC "UAT" are performing works on installation of pedestrian and pipeline tunnel of the free access zone and cable channel from the tunnel to the overpass of emergency cables.

Note:

 The Holding “Titan-2” is the largest in the North-West group of companies, erecting the most important objects of the nuclear industry and energy. The organization performs a full range of construction and installation works from engineering to commissioning.

 The Holding “Titan-2” is one of the main contractors for the construction of power units No. 1 and No. 2 of the Leningradskaya NPP-2. Main organizations of the company perform 30% of general construction and 80% of installation works on the site. Specialists of the holding are engaged on the objects of the Leningradskaya NPP-2 first and second power units. The works are being performed in the buildings of the reactor, turbine, electricity, water, heating system and other structures of power units.