Lot № | Hankinnan nimi | Valintapäivämäärä | Osallistujien lukumäärä | Voittaja | Lopullinen pöytäkirja |
Execution of the package of construction works for preparation of the construction base area of “Hanhikivi-1” NPP | 01.07.2015 | 4 | DESTIA LTD | ||
2 | Construction of power supply networks 20kV and fiber-optic communication line (FOCL) networks of the construction base for "Hanhikivi-1" NPP (Stage 1) | 03.09.2015 | 5 | Andament Group Ltd. | |
6 | Dredging works of the water area of the catch basin and the quay (stage 1, 200, 000 m3) for “Hanhikivi-1” NPP | 05.10.2015 | 4 | WASA DREDGING LTD. | |
4 | Design and survey for construction and modernization of Nuclear Power Plants on: “Hydraulic Structures: intake sea-level channel (10UPF), catch basin(10UPE), standby sea-level intake channel (10UPB), culvert (10UPG), protective dike (10UZS) for “Hanhikivi-1” NPP” (Development of DD for hydraulic structures) | 13.10.2015 | 6 | Sito Oy | |
8 | Pit excavation for main buildings and structures. Stage 1: removal of top soil | 13.10.2015 | 4 | Andament Group Ltd. | |
11 | Pit excavation works for main buildings and structures of “Hanhikivi-1” NPP. | 11.12.2015 | 8 | DESTIA LTD | |
12 | Supply of concrete for construction of “Hanhikivi-1” NPP. | 01.02.2016 | 3 | Ruskon Betoni Oy | |
14 | Environmental monitoring | 08.03.2016 | 6 | EHP Tekniikka NabLabs Oy | |
15 | Construction of water supply and household sewage networks on construction base (Stage 2) | 04.04.2016 | 5 | Ab Tallqvist Infra Oy | |
30 | Engineer survey for Detailed Design development. | 07.04.2016 | 2 | Geobotnia Oy | |
9 | Supply of transformer substations (construction base) | 18.05.2016 | 8 | ABB s.r.o. | |
31, 32 | Development of Detailed Design Documentation for Hydraulic Structures | 25.05.2016 | 1 | Sito Oy | |
10 | Provision of services of sorting and disposal of wastes. | 20.05.2016 | 2 | Suez Suomi Oy | |
24 | Construction of Sorted Waste Station | 06.07.2016 | 5 | Lapin Teollisuusrakennus Oy | |
29 | Installation of lighting networks of the construction base area, Installation of networks 0,4 kV, FOCL networks, earthing networks for mobilization camp. | 08.07.2016 | 4 | Eltel Networks Pohjoinen Oy | |
1 | Rent of Site office and canteen at the mobilization camp. | 29.07.2016 | 2 | Cramo Finland Oy | |
22 | Development of Basic Design and Detailed Design Documentation and construction and installation works for accommodation camp of “Hanhikivi-1” NPP | 25.08.2016 | 12 | Rakennuskartio Oy | |
49 | Geodetic network plan of "Hanhikivi-1" NPP | 29.08.2016 | 8 | Mitta Oy | |
27 | Construction of Water Supply Pumping Station | 06.10.2016 | 3 | Suomen Maastorakentajat Oy | |
50 | Construction dressing rooms (14 pcs. for 2600 people) at the Temporary mobilization site | 19.10.2016 | 9 | UAB “PROFILEKSAS” | |
25 | Development of Detailed Design Documentation and construction and installation works to erect two Administrative buildings: for the Contractor (200 pers.) and the Customer (200 pers.) and a First Aid Medical Center for NPP “Hanhikivi-1” | 17.11.2016 | 5 | AS MARU EHITUS | |
37 | Installation of transformer substation 20kV, arrangement of power supply 20kV, FOCL and External Lighting Networks at the main site for “Hanhikivi-1” NPP | 10.02.2017 | 5 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
47 | Construction of external discharge hydraulic structures at the aquatorium of “Hanhikivi-1” NPP | 13.02.2017 | 8 | AS BMGS Eesti filiaal | |
54 | Construction and installation works to build a local waste treatment facility for “Hanhikivi-1” NPP | 28.02.2017 | 2 | Ab Tallqvist Infra Oy | |
35 | Installation of transformer substation 20kV at the construction base area” for “Hanhikivi-1” NPP. | 31.03.2017 | 3 | Pluvo OÜ, Suomen sivuliike | |
53 | Development of Detailed Design Documentation and construction and installation works to erect a canteen for 600 seats for NPP “Hanhikivi-1” | 07.04.2017 | 7 | AS MARU EHITUS | |
48 | Protection of the pit for main buildings and facilities of "Hanhikivi-1" NPP | 20.04.2017 | 3 | DestiaLtd. | |
92 | Installation of power supply 0,4kV for VP-2 at the site for "Hanhikivi-1" NPP | 26.04.2017 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
93 | Installation of power supply 0,4kV for VP-0 at the site for "Hanhikivi-1" NPP | 15.05.2017 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
58 | Rock soil crushing after blasting works at the "Hanhikivi-1" NPP site | 25.05.2017 | 5 | Ab Tallqvist Infra Oy | |
26 | Development of Detailed Design Documentation of reinforcement production facility at the construction base of "Hanhikivi-1" NPP | 15.06.2017 | 4 | AS Siltumelektroprojekts | |
98 | Supply of Measuring Equipment and Instrumentation for "Hanhikivi-1" NPP Construction Site | 22.06.2017 | 1 | Leica Geosystems Oy | |
100 | Performance of construction and installation works for arrangement of rock soil storage area | 07.07.2017 | 5 | Ab Tallqvist Infra Oy | |
73 | Construction of external water-intake hydraulic structures at the aquatorium of "Hanhikivi-1" NPP. | 21.07.2017 | 4 | Suomen Maastorakentajat Oy | |
99 | Installation of 0.4kV power supply for "Hanhikivi-1" NPP | 20.07.2017 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
113 | Dismantling of cottages at the "Hanhikivi-1" NPP Construction Site | 17.08.2017 | 3 | Veljekset Kellola Oy | |
28 | Arrangement of fence of “Hanhikivi 1” NPP construction and installation base | 19.12.2017 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
157 | Earthworks and installation of outdoor site utilities for "Hanhikivi-1" NPP facilities construction: Guard houses 91UYF 92UYF 93UYF | 20.03.2018 | 1 | Veljekset Kellola Oy | |
129 | Construction of Access Control Point buildings 91UYF 92UYF 93UYF 94UYF 95UYF of the construction and installation base of "Hanhikivi-1" NPP | 27.04.2018 | 9 | AS MARU EHITUS | |
147 | Arrangement of the driveways and walkways for “Hanhikivi-1 NPP” construction facilities: guard houses 91UYF 92UYF 93UYF | 15.05.2018 | 1 | YIT INFRA OY (LEMMINKÄINEN INFRA OY) | |
107 | Performance of CIW on embankment arrangement and storage facilities ground levelling. | 11.02.2019 | 3 | Takanen MR Oy | |
215 | Supply, assembly and installation of the furniture for the Administrative buildings 94UYA and 95UYA. | 11.03.2019 | 7 | UAB Ergolain projektai | |
215.1 | "Supply, assembly and installation of kitchen furniture and appliances in the 94UYA and 95UYA administrative and amenity buildings" | 08.05.2019 | 3 | UAB Ergolain projektai | |
215.2 | “Supply, assembly and installation of kitchen furniture and appliances for the 91 UYF checkpoint” | 23.05.2019 | 1 | UAB Ergolain projektai | |
229 | Commissioning of VP-1 and VP-2 pumps | 25.05.2019 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
136 | “Performance of lifting operations within the territory of Hanhikivi-1 NPP (framework contract)” | 10.06.2019 | 4 | PJP Nosto Oy / E. Helaakoski Oy | |
148.5 | Set of Works on Construction of Anti-Corrosive Treatment Shop with a Spray Cabinet (94UST), Paint Warehouse (93USK) | 06.06.2019 | 5 | SCM Latvia | |
243 | “Services on Disposition of Personnel at Accommodation Camp” | 28.06.2019 | 3 | WTS Services Oy | |
248 | "Soil transportation from Hanhikivi 1 NPP construction site" | 09.07.2019 | 1 | AS BMGS Filial | |
184 | "Supply of weight station 94UZD" | 19.07.2019 | 3 | Lahti Precision Oy | |
96 | Pit excavation for standby water outlet struсture 10UQU on the Hanhikivi 1 NPP construction site. | 22.07.2019 | 1 | AS BMGS Filial | |
148.8.1 | Supply of cranes for reinforcement shop | 25.07.2019 | 7 | Konecranes Finland Oy | |
238 | "Construction and Installation Works for Arrangement of Water Supply Pipeline Inlets and Drainage Outlets for Buildings 93UST, 92USN, 93UYA" | 06.08.2019 | 3 | AS MARU EHITUS | |
239 | “Maintenance of 93UGR and 94UGR Surface Runoff Treatment Facilities and Settlement Ponds” | 03.09.2019 | 1 | Lassila & Tikanoja Plc | |
64.1 | Concrete mixes independent laboratory tests in accordance with Preliminary concrete test program | 06.09.2019 | 3 | SGS Intron B.V. | |
107.1 | Construction of storage facilities 91USU, 92USU, 93USU, 94USU, 97 UYA, 98 UYF, 90USK, 95USK, 96USK, 97USK, 98USK, 99USK, development of on-site and external utility networks, area fence and installation of block-modular boiler 91UTH. | 13.09.2019 | 9 | UAB BORGALITA | |
254 | Provision of Services on Geodetic Monitoring of Geodetic Network Markers by Measurement | 04.10.2019 | 2 | Taratest Oy | |
FH1-17-022 | Supply of pipelines and drains | 22.10.2019 | 1 | LLC "Titan Technology Pipeline" | |
272 | Provision of services on assessment of justification, documental confirmation and compliance with the stated expenses amount of Ruskon Betoni Oy company related to the supply, design, installation and commissioning of two concrete facilities located in the Hanhikivi-1 NPP construction and installation base area | 24.10.2019 | 3 | TJP Consulting Oy | |
197 | Performance of Works on Installation of Communication Networks and Automatic Fire Alarm System at “Dressing Rooms” (92 UYA) | 20.12.2019 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
269 | Supply of formwork system for the construction of reinforced concrete structures at Hanhikivi-1 NPP | 08.01.2020 | 2 | PERI Suomi Ltd Oy | |
178 | Rendering of services for crushing of rock after drilling and blasting works at the Hanhikivi-1 NPP Construction Site | 17.01.2020 | 3 | Treivan Company Oy | |
281 | Rent of construction equipment | 13.02.2020 | 4 | Veljekset Kellola Oy | |
287 | Supply of materials and equipment for communication systems and structured cabling system of Administrative buildings 94UYA, 95UYA | 13.02.2020 | 4 | Rexel Finland Oy | |
175 | "Maintenance of Temporary Buildings and Structures 90UYJ, 92UYD, 90USG, SPS of the Accommodation Camp, SPS VP0, SPS VP1, SPS VP2 and Fire Hydrants at the Hanhikivi-1 NPP Construction Site" | 02.03.2020 | 3 | WTS Services Oy | |
247 | "Maintenance of Temporary Buildings and Structures 94UYA, 91UYF, 92UYF, 91UYA at the Hanhikivi-1 NPP Construction Site" | 02.03.2020 | 3 | WTS Services Oy | |
218 | Construction of buildings of the construction and installation base of Hanhikivi-1 NPP: Pre-Installation Shop (96UST) Turbine Shop (98 UST), Outdoor Assembly and Pre-Assembly Site (94UZC), 94USK Cylinders Warehouse, Outdoor Assembly and Pre-Assembly Site (92UZC), Chief Mechanic’s and Chief Power Engineer’s Shops (95UST) (external engineering networks, reinforced concrete structures, metal structures) | 06.03.2020 | 7 | SCM Latvia | |
291 | Provision of consulting services concerning taxation, tax planning, accounting and risks related to these issues when performing construction and installation works, equipment deliveries, design under the contract of Hanhikivi-1 NPP Construction Project | 19.03.2020 | 4 | TJP Consulting Oy, Ernst & Young Oy | |
259 | Delivery and Installation of Communication Systems, Automatic Fire Alarm System, ACS Equipment for Checkpoints 91UYF, 92UYF | 25.03.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
281.1 | Rent of construction equipment | 30.03.2020 | 3 | Veli Seppä Oy, Veljekset Kellola Oy, E.Helaakoski Oy | |
290 | Primary fire extinguisher equipment periodical maintenance service for the Hanhikivi 1 NPP | 30.03.2020 | 2 | Raahen SHT Oy | |
293 | Supply of Equipment for confined space works for the Hanhikivi-1 Site | 10.04.2020 | 2 | IKAR GmbH | |
297.1 | Supply of tools and materials for foundation slab construction 97 UZC and Security Control Point 91-92UYF | 10.04.2020 | 3 | TOOLS Finland Oy, K-RAUTA Ojan Rauta Kalajoki, Pohjanmaan Rauta Oy | |
218.2 | Laying External Electric Power Networks and Outdoor Lightning for Hanhikivi-1 NPP Construction and Installation Base Buildings: Cylinder Warehouse (94USK), Outdoor Pre-Assembly Site (92UZC) | 23.04.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
289.3 | Supply of Portable Falling Weight Deflectometer | 23.04.2020 | 3 | Englo LLC | |
148.6 | Laying of utilities (external and internal ones), performance of finishing works in buildings 93UST, 92USN, 93UYA, and improvement of the reinforcement facilities territory | 29.04.2020 | 1 | AS MARU EHITUS | |
303 | Rent of Equipment and Tools for Hanhikivi-1 NPP | 14.05.2020 | 3 | Cramo Finland Oy | |
308 | Supply of materials and tools for the construction of the 90USK cold storage and aggregate warehouse 91USK | 15.05.2020 | 4 | K-RAUTA Ojan Rauta Kalajoki, TOOLS Finland Oy, Onninen Oy | |
236 | Supply and Installation of Equipment for the Structured Cabling System in Transformer Substations 91UAD, 92UAD, 95UAD, 96UAD, 97UAD | 20.05.2020 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
107.2.1.1 | Excavation works and arrangement of storage facility foundations, “Cold Storage” 90USK, “Cold Storage” 96USK, “Cold Storage” 97USK, “Cold Storage with Heat Insulation” 98USK, “Cold Storage with Heat Insulation” 99USK | 12.06.2020 | 5 | Takanen MR Oy | |
107.2.2.1 | Excavation works and arrangement of storage facility foundations, “Warm Storage” 91USU, “Heat Insulated Cold Storage” 92USU, “Heat Insulated Cold Storage” 93USU, “Heat Insulated Cold Storage” 94USU, “Cold Storage” 95USK | 12.06.2020 | 4 | Takanen MR Oy | |
302 | Rent of wall formwork for 91USK at Hanhikivi-1 NPP | 09.06.2020 | 2 | PERI Suomi Ltd Oy | |
404 | Supply of ventilation filters | 11.06.2020 | 4 | Onninen Oy | |
401 | Installation of injection valves, grouting of foundation, dismantling of the fence, wells and pipes | 11.06.2020 | 1 | AB BMGS Filial | |
405 | Supply of materials for the construction of the plate of the storage site 97UZC | 03.07.2020 | 6 | Levanto Oy, Oy Sika Finland Ab, Onninen Oy, TOOLS Finland Oy | |
408 | Provision of services for the removal of water from the excavated pit of nuclear and turbine islands at the Hanhikivi-1 NPP construction site | 10.07.2020 | 3 | Veli Seppa Oy | |
403 | Development of Detailed Design Documentation Field Change Request (FCR) | 10.07.2020 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
407 | Rent of Scaffolding for 91 USK at Hanhikivi-1 NPP | 27.07.2020 | 2 | PERI Suomi Ltd Oy | |
305 | Installation of mechanical door closures (for external doors), number plates and information shield | 30.07.2020 | 1 | UAB Profileksas | |
400 | Dismantling of installed aluminum frame canopy and anchoring steel plates, installation of door canopy and galvanized steel sheet | 30.07.2020 | 1 | UAB Profileksas | |
309.1 | Performance of Works on External Power Supply of Reinforcement Production 93UST | 30.07.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
107.2.3 | Arrangement of foundation beams and backfilling of foundations of buildings of storage facilities 90USK Cold Storage Warehouse, 96USK Cold Storage Warehouse, 97USK Cold Storage Warehouse, 98USK Cold Storage Warehouse, 99USK Thermal-Protected Cold Storage Warehouse, 91USU Warm Storage Warehouse, 92USU Thermal-Protected Cold Storage Warehouse, 93USU Thermal-Protected Cold Storage Warehouse, 94USU Thermal-Protected Cold Storage Warehouse, 95USK Cold Storage Warehouse | 21.08.2020 | 3 | Takanen MR Oy | |
500 | Supply of geodesic equipment | 24.08.2020 | 1 | Leica Geosystems Oy | |
131.1 | Protection of water supply networks of Concrete Batching Plants 91UST and 92UST | 24.08.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
131.2 | Protection of electricity supply networks of Concrete Batching Plants 91UST and 92UST | 24.08.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
225 | Soil Excavation, Laying Sewage Outlets, Installation of Foundation Slabs and Fencing for the Building of 92UTH Block-Modular Boiler House and 50 m3 Fuel Storage Tank | 25.08.2020 | 1 | AS Maru Ehitus | |
225.1 | Arrangement of External Water Supply and Sewerage Networks of 92UTH Block-Modular Boiler House with the Fuel Storage Capacity of V = 50 m3 | 25.08.2020 | 1 | AS Maru Ehitus | |
409 | Services provision on implementation of compulsory financial and economic activity audit of the branch of JSC CONCERN TITAN-2 in terms of construction and installation works, equipment supply and design during the Hanhikivi-1 NPP construction | 28.08.2020 | 1 | KPMG Oy Ab | |
101 | Supply, installation and commissioning of Modular boiler houses 91UTH and 93UTH | 28.08.2020 | 7 | MICo, spol. s r.o. | |
221 | Arrangement of 93UZH and 94UZH Rocky Soil Storage Sites | 28.08.2020 | 3 | Ab Tallqvist Infra Oy | |
231 | Performance of Work Package for Installation of Cranes of Facilities 93UST “Reinforcement Shop” and 92USN “Metal Warehouse” | 28.08.2020 | 2 | Konecranes Finland Oy | |
218.3 | Construction of Hanhikivi-1 NPP Construction and Installation Base Buildings: Pre-Installation Shop (96UST), Turbine Shop (98UST), Outdoor Pre-Assembly Site (94UZC), Chief Mechanic’s and Chief Power Engineer’s Shops (95UST), Outdoor Pre-Assembly Site (97UZC) (External Electric Power Networks, Communication and Signalling Networks, Outdoor Lightning) | 02.09.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
290.1 | Primary fire extinguisher equipment periodical maintenance service for the Hanhikivi 1 NPP” | 10.09.2020 | 3 | Raahen SHT Oy | |
514 | Performance of works for replacement of automatic circuit breakers in distribution panels JaKe 2.4 – 2.10 | 11.09.2020 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
523 | Supply and Technical Service of printer Konica Minolta C250i | 11.09.2020 | 2 | Keski-Pohjanmaan Konttoripiste Oy | |
309 | Performance of Works for Internal Grounding System Installed in 93UST Building Floor Slab (Reinforcement Shop), 92USN (Metal Storehouse), 93UYA (Administration and Amenity Additional Building) | 18.09.2020 | 1 | Maru Ehitus AS | |
502 | Restoration of Concrete Cable Block between 91UAD and 92UAD Substations | 18.09.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
132 | Supply of bridge cranes for preassembly preparation shop 96UST, turbine shop 98UST, chief mechanic and chief power engineer shop 95UST, anticorrosion shop with paint booth 94UST, gantry crane for open pre-assembly site 94UZC | 18.09.2020 | 6 | BALTIC CRANES INDUSTRY, UAB | |
511 | Performing works for injecting auger piles of the 10UPC water intake facility through pipe connections | 22.09.2020 | 1 | Suomen Maastorakentajat Oy | |
294 | Supply of equipment for transformer substations 91UAD and 95UAD modernization | 22.09.2020 | 1 | ABB s.r.o. | |
526 | Supply of tools and materials for construction of reinforced concrete structures of the aggregate warehouse 91USK | 25.09.2020 | 8 | Oy Sika Finland Ab, Tools Finland Oy, K-Rauta Ojan Rauta Kalajoki, Etra Oy | |
504 | Manufacturing and Supply of Steel Structures for Aggregate Warehouse 91USK | 25.09.2020 | 3 | SCM Latvia | |
304 | Services for provision of working personnel for the needs of the Hanhikivi-1 NPP construction program | 02.10.2020 | 8 | Andi Retro OU, Treivan Company Oy, Betofin Rakennus Oy, Barona | |
257.1 | Maintenance of Equipment for Monitoring and Monitoring of Temporary Dams for Water Outlet Structure (10UQQ) | 02.10.2020 | 1 | AS BMGS Filial | |
226 | Performance of Works on Arrangement of 91UZA and 92UZA Bus Shelters | 02.10.2020 | 1 | WOLLER Oy | |
257 | Supply and Installation of Equipment for Monitoring of Temporary Dams of Water Outlet Structures (10UQQ) | 02.10.2020 | 1 | AS BMGS Filial | |
510 | Rent of water meters on installed water drainage networks from the excavated pit for main buildings and structures | 09.10.2020 | 1 | Veli Seppa Oy | |
402 | Supply of diesel engine-driven pumps for pit dewateringа | 09.10.2020 | 4 | Victor Pumpen GmbH | |
219.3 | Installation and Connection of Access Control System of Checkpoints 91UYF, 92UYF | 12.10.2020 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
505.1 | Manufacturing, delivery and installation of caissons of 10UPG culvert at the standby seawater channel | 29.10.2020 | 2 | AS BMGS Filial | |
224.1 | Performance of works for arrangement of the external power supply and lighting networks for parking place for passenger cars 96UZD | 12.11.2020 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
224 | Arrangement of the Road Surface, Curb Stones and Sidewalks; Road Marking; Arrangement of a Smoking Area; Installation of Road Signs; Arrangement of Drainage Ditches on the Territory of the Facilities of 96UZD ‘Parking Place for Passenger Cars’, 94UYA, 95UYA ‘Administrative Building for 200 Persons’, and 92UYD ‘Canteen for 600 Seats | 20.11.2020 | 1 | Destia Oy | |
218.1 | Arrangement of outer wall envelope and roof structures, arrangement of floors, arrangement of walls and partitions, premise interior finishing, arrangement of internal water supply, sewage, heating and ventilation networks for buildings 95UST Chief Mechanic and Chief Power Engineer’s Shops, 96UST Pre-Installation Shop and 98UST Turbine Shop | 30.11.2020 | 2 | SCM Latvia | |
515 | Execution of works on mathematical modeling of heat discharge recirculation and waste water dilution on the Hanhikivi-1 NPP | 11.12.2020 | 1 | LLC Cardinal soft | |
132.1 | Performance of a set of works for gantry crane installation at the 92UZC Outdoor Pre-Assembly Site facility | 11.12.2020 | 1 | Konecranes Finland | |
542 | Performance of works on arrangement of lightning protection for facility 93UST reinforcement production workshop | 11.12.2020 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
543 | Supply of tools and materials for 92UYF Hanhikivi-1 NPP | 11.12.2020 | 6 | Hilti (Suomi) Oy, K-Rauta Ojan Rauta Kalajoki | |
545 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 11.12.2020 | 4 | TOOLS Finland Oy, K-Rauta Ojan Rauta Kalajoki | |
225.2 | Construction and Installation Works on Arrangement of External Utility Networks of 92UTH Block-Modular Boiler House (Electric Power Supply Networks) | 27.01.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
171.1 | Construction of Temporary Motor Roads Around Temporary Dam of 10UPC Water Intake Facility | 27.01.2021 | 4 | AS BMGS Filial | |
306 | Catering Services in the Building of Canteen for 600 Seats 92UYD | 01.02.2021 | 2 | Compass Group FS Finland Oy | |
102.1.2 | Supply and Installation of Metalworking Process Line and Process Equipment for Reinforcement Workshop (93UST). Equipment for Manufacturing of Reinforcement Units | 02.02.2021 | 4 | M.E.P. Macchine Elettroniche Piegatrici S.p.A. | |
551 | “Supply of tools and materials for 91USK Hanhikivi-1 NPP” | 08.02.2021 | 8 | Steamrator Oy, Hilti (Suomi) Oy, K-Rauta Ojan Rauta Kalajoki, TOOLS Finland Oy, Etra Oy и Onninen Oy | |
547 | Supply of Materials and Equipment to Ensure Environmental Protection and Environmental Safety Measures at Hanhikivi 1 NPP Construction Site | 08.02.2021 | 3 | Knorring Oy Ab и Comastri Distribution S.r.I | |
102.1.1 | Supply and Installation of Metalworking Process Line and Process Equipment for Reinforcement Workshop (93UST). Equipment for Metal Treatment | 08.02.2021 | 4 | Dreambird Ltd | Протокол_итогов_ЗП-102.1.1 |
225.2 | Construction and Installation Works on Arrangement of External Utility Networks of 92UTH Block-Modular Boiler House (Electric Power Supply Networks) | 27.01.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
171.1 | Construction of Temporary Motor Roads Around Temporary Dam of 10UPC Water Intake Facility | 27.01.2021 | 4 | AS BMGS Filial | |
306 | Catering Services in the Building of Canteen for 600 Seats 92UYD | 01.02.2021 | 2 | Compass Group FS Finland Oy | |
102.1.2 | Supply and Installation of Metalworking Process Line and Process Equipment for Reinforcement Workshop (93UST). Equipment for Manufacturing of Reinforcement Units | 02.02.2021 | 4 | M.E.P. Macchine Elettroniche Piegatrici S.p.A. | |
551 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 08.02.2021 | 8 | Steamrator Oy, Hilti (Suomi) Oy, K-Rauta Ojan Rauta Kalajoki, TOOLS Finland Oy, Etra Oy и Onninen Oy | |
547 | Supply of Materials and Equipment to Ensure Environmental Protection and Environmental Safety Measures at Hanhikivi 1 NPP Construction Site | 08.02.2021 | 3 | Knorring Oy Ab и Comastri Distribution S.r.I | |
102.1.1 | Supply and Installation of Metalworking Process Line and Process Equipment for Reinforcement Workshop (93UST). Equipment for Metal Treatment | 08.02.2021 | 4 | Dreambird Ltd | |
555.2.1 | Laying of Power Supply Cables and Weak Current Cables, Execution of Electrical Installation Works in Buildings 92USN ‘Metal Storehouse’, 93UYA ‘Administration and Amenity Additional Building’ | 16.02.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
546 | Supply of the oil boom at Hanhikivi 1 NPP Construction Site | 16.02.2021 | 3 | Knorring Oy Ab | |
554 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 16.02.2021 | 6 | PERI Suomi Ltd Oy, ETRA OY, Tools Finland Oy, Ojan Rauta Kalajoki | |
524 | Reinstallation of navigation buoy No. R2 of 10UPF seawater intake channel | 19.02.2021 | 1 | AS BMGS Filial | |
535 | Supply of reinforced concrete slabs for Concrete Batching Facilities of Hanhikivi-1 NPP | 19.02.2021 | 2 | Rudus Oy | |
552 | Organization of power supply for boom barriers and turnstiles at checkpoint 91UYF | 19.02.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
555.5 | Performance of construction and installation works for arrangement of power supply networks of building 91USK | 19.02.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
548 | Maintenance of temporary buildings and structures at the Hanhikivi-1 NPP construction site | 19.02.2021 | 3 | WTS Services Oy Ltd | |
107.5 | Performance of works for arrangement of slabs of floors and terrace steps of facilities 90USK “Cold Store”, 95USK “Cold Store”, 96USK “Heat-Insulated Cold Store”, 97USK “Cold Store”, 98USK “Heat-Insulated Cold Store ”, 99USK “Heat-Insulated Cold Store”, 91USU “Warm Store”, 92USU “Heat-Insulated Cold Store”, 93USU “Heat-Insulated Cold Store”, 94USU “Heat-Insulated Cold Store” | 12.03.2021 | 6 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
535.1 | Performance of works for paving the concrete batching facility with slabs | 12.03.2021 | 4 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
557 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 19.03.2021 | 8 | K-Rauta Ojan Rauta Kalajoki, Ab Vikströms Plåtslageri, Etra Oy, Onninen Oy, Tools Finland Oy и Ruukki Construction Oy | |
224 | Arrangement of the Road Surface, Curb Stones and Sidewalks; Road Marking; Arrangement of a Smoking Area; Installation of Road Signs; Arrangement of Drainage Ditches on the Territory of the Facilities of 96UZD ‘Parking Place for Passenger Cars’, 94UYA, 95UYA ‘Administrative Building for 200 Persons’, and 92UYD ‘Canteen for 600 Seats’ | 19.03.2021 | 2 | Treivan Company Oy | |
147.2 | Execution of CIW for laying of internal power supply networks, communication networks, automatic fire alarms for access control post 94UYF | 19.03.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
561 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 19.03.2021 | 5 | Ruukki Construction Oy и K-Rauta Ojan Rauta Kalajoki | |
562 | Supply of tools and materials for 91USK Hanhikivi-1 NPP | 19.03.2021 | 7 | Fidecol Oy, TOOLS Finland Oy, Ruukki Construction Oy и Onninen Oy | |
544 | Supply of Furniture and Equipment of 90UYJ Medical Centre | 26.03.2021 | 3 | Maru Ehitus AS | Протокол_итогов_ЗП-544 |
200 | Supply of Modular Transformer Substations 91UBD, 92UBD, 93UBD, 94UBD, 95UBD, 96UBD and 20kV Switchgear 90UAF | 26.03.2021 | 4 | Osaühing Antonio Trade | |
530 | Execution of CIW on arrangement of external utility networks of 96UYF access control post (Power Supply, Communication Networks, Grounding) | 26.03.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | |
518 | Construction and installation of the internal utility networks of 95UST building (Power supply system, fire alarm system, communication system) | 01.04.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-518 |
147.2.1 | Performance of CIW for arrangement of external power supply networks, communication and signalling networks and physical protection system of the access control point 94UYF | 01.04.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-147.2.1 |
107.3.2 | Execution of Construction and Installation Works for Arrangement of On-Site Networks of Storage Facilities (Power Supply, Power Lightning, Telecommunication Networks, and Physical Protection Systems) | 09.04.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-107.3.2 |
140.1 | Supply of Furniture and Equipment of Checkpoints 91UYF and 92UYF | 21.05.2021 | 5 | Gerdmans OY | Протокол_итогов_ТКП-140.1 |
516.1 | Supply of Modular Transformer Substation 94UAD | 23.04.2021 | 5 | Alfen Elkamo Oy Ab | Протокол_итогов_ТКП-516.1 |
102.2 | Supply of self-propelled trolleys for workshops | 23.04.2021 | 3 | MORELLO GIOVANNI S.R.L. | |
147.2.2 | Arrangement of Embankment, Foundations, Installation of Modular Units, Arrangement of Internal HVAC , Internal and External Water Supply and Sewerage of Checkpoint 94UYF, arrangement of сast-in-place reinforced concrete slab of pedestrian Checkpoint 96UYF | 23.04.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-147.2.2 |
219 | The Arrangement of the Checkpoint 93UYF (Land improvement, HVAC, water supply and ventilation networks, electricity, communication and alarm systems), the arrangement of the North Temporary Road, lighting networks 90UZA, the arrangement of the Automatic Traffic Control System (ATCS), the arrangement of the Motor Transport Weighting Station 94UZD, the installation of the Wheel Washing | 28.04.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-219 |
231.1 | Set of Cranes Installation Works to Be Performed for the Following Facilities: Anti-Corrosion Treatment Shop with a Paint Booth (94UST), Workshops of Master Mechanic and Chief Power Engineer (95UST), Pre-Installation Shop (96UST), Turbine Shop (98UST) | 30.04.2021 | 2 | SCM Latvia | Протокол_итогов_ЗП-231.1 |
107.6 | Works on Foundation Arrangement, Installation of Modular Units, Arrangement of Outer and Inner Ladders and Porches, HVAC, Water Supply and Sewage Internal Networks for 97UYA Storage Facilities’ Administrative Building and 98UYF Storage Facilities’ Checkpoint Building | 07.05.2021 | 2 | Maru Rakennus OY | Протокол_итогов_ЗП-107.6 |
567 | Operation of main networks of construction and installation base | 07.05.2021 | 3 | WTS Services Oy | Протокол_итогов_ЗП-567 |
564 | Insurance of the ready-mix station (RMS) located at Hanhikivi 1 NPP construction site | 07.05.2021 | 3 | Pohjola Vakuutus | |
227 | Performance of works for pit excavation, arrangement of foundations, installation of steel structures of the building frame, installation of wall envelope and roofing of complex construction laboratory 91USV | 07.05.2021 | 2 | AS Maru Ehitus | Протокол_итогов_ЗП-227 |
569 | Supply of a set of geodetic equipment for levelling | 07.05.2021 | 2 | Leica Geosystems Oy | |
218.3.1 | CIW for Arrangement of Internal Utilities 96UST, 98UST (Power Supply, Fire Alarm, Communication System) | 21.05.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-218.3.1 |
107.3.1 | Execution of works for arrangement of external heating and water supply networks, sanitary and storm water sewer networks of the General Contractor's Storage Facilities | 21.05.2021 | 2 | Takanen MR Oy | Протокол_итогов_ЗП-107.3.1 |
107.4.1.1 | Performance of Installation Works on HVAC Internal Networks of Storage Facilities 97USK, 98USK, 99USK, 90USK | 28.05.2021 | 2 | Treivan Company Oy | Протокол_итогов_ЗП-107.4.1.1 |
102.7 | Supply of electrical forklift for reinforcement shop | 28.05.2021 | 3 | Onninen Oy | Протокол_итогов_ТКП-102.7 |
102.9 | Supply of hoisting machines for reinforcement shop | 28.05.2021 | 3 | SILCOM NORTH UAB и Fertema Oy | Протокол_итогов_ТКП-102.9 |
579 | Provision of legal services | 04.06.2021 | 2 | ApplexAttorneysLtd | |
577 | Provision of Services for the Removal of Water from the Excavated Pit of Nuclear and Turbine Islands at the Hanhikivi-1 NPP Construction Site | 08.06.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ТКП-577 |
580 | Provision of services on leasing the pumps for dewatering the excavated pit for nuclear and turbine islands at the Hanhikivi-1 NPP Construction Site | 08.06.2021 | 1 | Cramo Finland Oy | Протокол_итогов_ТКП-580 |
571 | Maintenance of Domestic and Internal Water Supply, Storm Water Sewerage, Domestic Sewerage, External and Internal Power Supply Networks and Ventilation and Heating System of Sorted Waste Station 99UZC as well as of Fabric Building 96USU and Operator’s Building 96UYA adjacent thereto | 11.06.2021 | 3 | WTS Services Oy Ltd | Протокол_итогов_ЗП-571 |
231.1.1 | Performance of a set of works for gantry crane installation at the 94UZC | 11.06.2021 | 1 | SCM Latvia | Протокол_итогов_ТКП-231.1.1 |
537 | Construction and Installation Works Consisting in Installation of External Utilities of 91UTH, 93UTH Block-Modular Boiler Houses (Power Supply Grids) | 11.06.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-537 |
102.4 | Supply of compressors for reinforcement shop 93UST | 11.06.2021 | 2 | MICo spol. s.r.o. | Протокол_итогов_ТКП-102.4 |
107.4.1.1.1 | Performance of Installation Works on HVAC Internal Networks of Storage Facilities 91USU, 92USU, 93USU, 94USU, 95USK, 96USK | 23.06.2021 | 2 | Treivan Company Oy | Протокол_итогов_ЗП-107.4.1.1.1 |
227.1 | Soil excavation, installation of external water supply and sewer networks as well as external heat supply networks of Construction Integration Laboratory 91USV | 23.06.2021 | 1 | AS Maru Ehitus | Протокол_итогов_ЗП-227.1 |
560.1 | Electrical maintenance of Batching Plants | 05.07.2021 | 1 | TTJ System | |
578 | Supply of laboratory equipment for Hanhikivi-1 NPP | 05.07.2021 | 4 | SEMTEC OY, Suomen Atomit Oy и Basis Group Ltd | |
559 | Execution of the repair works of 3 mobile diesel-generator light towers ATLAS COPCO H5+ | 05.07.2021 | 1 | Cramo Finland Oy | |
583 | Provision of services of FISE qualification specialist | 05.07.2021 | 1 | OAMK (OULUN AMMATTIKORKEAKOULU OY) | |
102.3.1 | Supply and Installation of Machines for Resistant Spot and Mechanized Submerged Welding for Reinforcement Shop (93UST) | 16.07.2021 | 1 | Nord Steel, UAB | Протокол_итогов_ТКП-102.3.1 |
102.3.3 | Supply of Welding Tables for Reinforcement Shop (93UST) | 16.07.2021 | 2 | WM-Plast | Протокол_итогов_ТКП-102.3.3 |
565 | Supply of switchgear and transformers for reinforcement shop | 16.07.2021 | 3 | StemaLux OÜ | Протокол_итогов_ЗП-565 |
w/n | Concluding an Addendum to the Contract No. FF-01-0100-21 dd. 21 April 2021 with JSC SEM for the performance of works for arrangement of external power supply networks, communication and signalling networks of building 94UYF due to the release of detailed design documentation sets FH.1.D.T031.9.4UYF&&.&&&&&&.034.DC.0001.S for production | 16.07.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Concluding an Addendum to the Contract No. FF-02-0045-20 dd. 14 January 2021 with Pohjatekniikka Oy for development of the Detailed Design Documentation Pit for the Main Buildings and Structures (Dividing the Scope of Work into Stages – Stage 0, Stage 1 and Stage 2). | 16.07.2021 | 1 | Insinööritoimisto Pohjatekniikka Oy | Протокол_итогов_ЕП |
w/n | Concluding an Addendum to the Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Oy for Corrections to the Contract Price Sheet for the Scope of Work for the Construction of Temporary Protective Dam 91UPR for Construction of Supply Tunnel 10UPR of the Hanhikivi-1 NPP | 16.07.2021 | 1 | Skarta Oy | Протокол_итогов_ЕП_Skarta_Oy |
w/n | Concluding an Addendum to the Contract No. FF-01-0052-18 dd. 25 May 2018 with JSC SEM concerning the change of description and scope of work for Installation and connection of physical protection system of access control points 91UYF, 92UYF, due to the release of FCR 20-000182 Rev. 2 and FCR 20-000183 Rev. 2. | 27.07.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Concluding an Addendum to the Contract No. FF-01-0090-21 dd. 4 March 2021 with JSC SEM concerning the modification of description and scope of work for electrical solutions (electrical equipment) of Buildings 92USN, 93UYA, due to the release of FCR 20-000227 Rev. 2 and FCR 20-000228 Rev. 2. | 27.07.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
531 | Installation of HVAC Instrumentation, Control and Automation Systems for Buildings 95UST, 96UST, 98UST | 05.08.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-531 |
582 | Work Package for Injection Operations in and Arrangement of the Pit for Main Buildings and Structures of the Hanhikivi 1 NPP to El. -2.000 | 10.08.2021 | 3 | METROSTAV A.S. sivuliike Suomessa | Протокол_итогов_ЗП-582 |
102.5 | Supply of machines and equipment for workshops 94UST, 96UST, 98UST | 13.08.2021 | 7 | Prof Techno, Intolog Oulu Oy, ETRA Oy Raahe, DREAMBIRD LTD | Протокол_итогов_ТКП-102.5 |
102.3.2 | Supply of a Set of Welding Equipment for Gas-Shielded Welding with Welding Production Monitoring and Control System | 13.08.2021 | 5 | Kemppi Oy | Протокол_итогов_ТКП-102.3.2 |
576 | Construction of a Pit for 10UQQ Water Outlet Structure | 13.08.2021 | 2 | AS BMGS Filial | Протокол_итогов_ЗП-576 |
536.1 | Soil Excavation, Laying of Sewage Outlets, Arrangement of Foundation Slabs, Arrangement of External Water Supply and Sewage Networks of 93UTH Block-Modular Boiler House and Fuel Storage Tank | 13.08.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-536.1 |
555.8 | Installation of physical protection system and structured cable system at checkpoint 93UYF | 13.08.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-555.8 |
587 | Works Execution on the construction of an embankment made of crushed stone of the 0-90mm fraction for foundation beams and foundation slabs of objects 97UYA "Administrative building" and 98UYF "Checkpoint" | 13.08.2021 | 2 | Takanen MR Oy | Протокол_итогов_ЗП-587 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0051-18 dd. 9 May 2018 with Luode Consulting Oy for provision of services for monitoring water level in two gloe lakes in the vicinity of cooling water discharge location. | 13.08.2021 | 1 | Luode Consulting O | Протокол_итогов_ЕП_Luode |
593 | Provision of tax audit support services | 25.08.2021 | 2 | KPMG Oy Ab | Протокол_итогов_ТКП-593 |
w/n | Concluding an Addendum to Contract No. FF-01-0095-21 dd. 24/03/2021 with JSC SEM Concerning the Corrections in the Bill of Quantities for Arrangement of Floor Slabs and Doorsteps of Facilities 90USK, 95USK, 96USK, 97USK, 98USK, 99USK, 91USU, 92USU, 93USU and 94USU | 25.08.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Сoncluding an Addendum to Contract No. FF-01-0086-20 dd. 30/12/2021 with JSC BMGS concerning the prolongation of the Contract on Monitoring of 10UQQ Temporary Dams | 30.08.2021 | 1 | JSC BMGS | Протокол_итогов_ЕП_JSC_BMGS |
w/n | Concluding an Addendum to Contract No. FF-01-0060-19 dd. 06/06/2019 with SCM Latvia Concerning the Performance of Works on Arrangement of Floors and Partitions Made of FIBO Blocks for 94UST Structure, and Arrangement of Wall and Roof Sandwich Panels for 93USK Structure | 30.08.2021 | 1 | SCM Latvia | Протокол_итогов_ЕП_SCM |
w/n | Concluding an Addendum to Contract No. FF-01-0063-19 dd. 12/09/2019 with JSC SEM for the Performance of Additional Works on Installation of Cable Wells and Routing of Optic Communication Line on the CIB Territory | 30.08.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Concluding an Addendum to Contract No. FF-01-0079-20 dd. 02/09/2020 with JSC SEM Concerning the Performance of Works on Implementation of External Power Supply System for 95UST, 98UST | 31.08.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
596 | Provision of legal services for “Hanhikivi 1” NPP construction project | 10.09.2021 | 1 | Smartius Oy | Протокол_итогов_ТКП-596 |
w/n | Сonclusion of an Addendum to Contract No. FF-17-0001-19 dd. 6 September 2019 with SGS Intron B.V. for laboratory testing of concrete mixtures in order to determine the concrete creeping rate | 10.09.2021 | 1 | SGS Intron B.V. | Протокол_итогов_ЕП_SGS_Intron_B.V. |
592 | Performance of Work for Interior Rooms Construction, Interior Rooms Finishing, Arrangement of Fire Protection of Load-Bearing Metalwork, Controlled Drainage System from Roofs of Warehouses 90USK, 99USK, 98USK, 97USK, 96USK, 94USU, 93USU, 92USU, 91USU. | 22.09.2021 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-592_eng |
w/n | Concluding an Addendum to the Contract No. FF-01-0112-21 dd. 16 July 2021 with Treivan Company Oy for Performance of Works on Installation of Internal HVAC Networks of Storage Facilities 97USK, 98USK, 99USK, 90USK. | 24.09.2021 | 1 | Treivan Company Oy | Протокол_итогов_ЕП_TREIVAN_FF-01-0112-21_eng |
227.2 | Performance of Works for Arrangement of Telecommunications and Alarm Systems, Power Supply Networks, Fire Alarm System and Physical Protection Systems of Construction Laboratory 91USV. | 24.09.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-227.2_англ |
584 | Supply of Switchgear 20 kV for Laboratory 91USV and Transformer 1600 kVA for Reinforcement Production Complex 93UST. | 24.09.2021 | 1 | StemaLux OÜ | Протокол_итогов_ЗП-584_англ |
594 | Development of the Detailed Design Documentation for the Hanhikivi-1 NPP | 24.09.2021 | 2 | JSC "Siltumelektroprojekts" | Протокол_итогов_ЗП-594_англ |
598 | Rendering Heating Appliances Rental Services and Arrangement of Heating for Buildings 93UST and 93UYA at the Hanhikivi-1 NPP Construction Site | 24.09.2021 | 2 | Cramo Finland Oy | Протокол_итогов_ЗП-598_англ |
w/n | Concluding an Addendum to the Contract No. FF-01-0083-20 dd. 3 December 2020 with JSC SEM for Performance of Works on Arrangement of the External Power Supply and Lighting Networks for Parking Place for Passenger Cars 96UZD | 29.09.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ_FF-01-0083-20_англ |
w/n | Concluding an Addendum to the Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Finland Oy for Performance of Construction and Installation Works on Erection of Dams 10UPC, 90UPC and 91UPR due to the release of FCR21-00059 rev.2, FCR19-000076 rev.1. | 30.09.2021 | 1 | Skarta Finland Oy | Протокол_итогов_ЕП_Skarta_FF-01-0034-17_англ |
w/n | Concluding an Addendum to the Contract No. FF-01-0092-21 dd. 24 March 2021 with JSC SEM for Performance of Works on Implementation of the Power Supply System of Access Control Points 91UYF, 92UYF due to the release of FCR 20-000165 rev.1, FCR 18-000067 rev.4. | 30.09.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_СЭМ_FF-01-0092-21_англ |
602 | Development of Detailed design documentation for Hanhikivi-1 NPP facilities: "Temporary Buildings and Structures. Plant Site. The Road around the Pit. Stages 1 and 2; Temporary Buildings and Structures. Plant Site. Pit Fencing. General Works. Stages 1 and 2 | 30.09.2021 | 2 | JSC „Siltumelektroprojekts” | Протокол_итогов_ЗП-602 |
599 | Provision of Services for Temporary Observation of the Equipment in Building 93UST at the Hanhikivi-1 NPP Construction Site | 30.09.2021 | 3 | WTS Services Oy Ltd | Протокол_итогов_ЗП-599 |
590 | Performance of Work Package Consisting of Installation of Power Supply Grids, Telecommunications, Fire Alarm System, Marking of 90USK, 99USK, 91USU, 92USU Warehouses’ Escape Routes. Stage 1. | 30.09.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-590 |
607 | Execution of work on obtaining non-nuclear construction permits and obtaining updates of non-nuclear construction permits for Hanhikivi-1 NPP facilities in the municipality of Pyhajoki. | 08.10.2021 | 1 | ART-Palvelu Säkkinen | Протокол_итогов_ЗП-607 |
w/n | Concluding an Addendum to the Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Finland Oy for Performance of Works on Excavation of Loose Soil and Installation of RD Piles during the Arrangement of Temporary Protective Dam 91UPR, Injection of Rock Soil, Bored and Cast-And-Place Piles and Piles Feet through the Lock, Coast Protection and Soil Excavation during Construction of Longitudinal Dam 10UPC, Construction of Walls from Bored and Cast-and-Place Piles, Rock Injection, Dam Body Construction during Erection of Temporary Dam 10UPC due to the release of FCR 21-000059 rev.2, 19-000076 rev.1. | 08.10.2021 | 1 | Skarta Finland Oy | Протокол_итогов_ЕП_Skarta |
585 | Arrangement of Hydraulic Structures: access Tunnel 90UPR to Supply Tunnel 10UPR, Supply Tunnel 10UPR, Pit for Cooling Water Treatment Building 10UPH, Water Intake Structure 10UPC, Access Tunnel 90UQN of Discharge Tunnel of Turbine Island 10UQN and Discharge Tunnel of Turbine Island 10UQN | 11.10.2021 | 3 | METROSTAV A.S. sivuliike Suomessa | Протокол_итогов_ЗП-585 |
570 | Monitoring of the 91UPR protective dam for the 10UPC water intake structure and the 10UPR supply tunnel, including the purchase, rental and installation of monitoring equipment | 28.10.2021 | 2 | AS BMGS Filial | Протокол_итогов_ЗП_570 |
w/n | Concluding an Addendum to the Contract No. FF-01-0081-20 dd. 30 October 2020 with AS BMGS Filial for the Performance of Works on the Installation of Culvert Foundation Made of Crushed Stone of 0-64 mm and 0-300 mm Fractions, Concreting Between the Caisson Counterweight Elements of the 10UPG Culvert. | 28.10.2021 | 1 | AS BMGS Filial | Протокол_итогов_ЕП_AS_BMGS |
w/n | Concluding an Addendum to the Contract No. FF-04-0008-19 dd. 25 July 2019 with Konecranes Finland Oy for the Supply of Crane Power Supply System Elements for 93UST and 92USN Buildings. | 28.10.2021 | 1 | Konecranes Finland Oy | Протокол_итогов_ЕП_Konecranes |
w/n | Concluding an Addendum to the Contract No. FF-01-0060-19 with SCM Latvia for the Performance of Additional Works on Installation of Support and Suspension System and Support Underlying Structures of 94UST Building due to the Issue of Detailed Design Documentation Set FH1.D.T031.9.4UST&&.&&&&&&.038.BG.0001.S. for Implementation. | 28.10.2021 | 1 | SCM Latvia | Протокол_итогов_ЕП_SCM |
w/n | Concluding an Addendum to the Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Group Oy for the Reimbursement of the Sub-Contractor’s Expenses Pertaining to Electrical Power Generation for the Performance of Works. | 28.10.2021 | 1 | Skarta Group Oy | Протокол_итогов_ЕП_Skarta |
w/n | Concluding an Addendum to the Contract No. FF-01-0044-18 dd. 13 March 2018 with JSC SEM for the Reimbursement of the Sub-Contractor’s Expenses Pertaining to Electrical Power Generation for the Performance of Works. | 28.10.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Concluding an Addendum to the Contract No. FF-01-0077-20 dd. 24 August 2020 with JSC SEM for Performance of Works on Installation of the Power and Water Supply Networks Protection of 91UST and 92UST Concrete Batching Plants. | 28.10.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
592.1 | Work Package for Arrangement of Power Supply Networks, Communication Networks and Fire Alarm at Storages 98USK, 97USK, 96USK, 94USU, 93USU | 29.10.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_592.1 |
603 | Work Package Execution on Installation of Cable Metal Structures and Lighting System. Reinforcement Workshop 93UST | 29.10.2021 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП_603 |
w/n | Concluding an Addendum to the Contract No. FF-01-0053-18 dd. 25 June 2021 with AS Maru Ehitus for the Performance of Finishing Works at 92USN Metal Warehouse and 93UST Reinforcement Shop, Installation of 93UST Building Gates, Installation of Facade and Roof of 93UYA Building, Installation of Ventilation of 93UST and 93UYA Buildings and Installation of 93UST Building Heat Supply Networks on the Territory of Hanhikivi-1 NPP CIB. | 29.10.2021 | 1 | AS Maru Ehitus | Протокол_итогов_ЕП_AS_MARU |
w/n | Concluding an addendum to the Contract No. FF-02-0007-16 dd. 25 June 2016 with Sitowise Oy for the performance of works on correction of the detailed design documentation and 3D models. | 29.10.2021 | 1 | Sitowise Oy | Протокол_итогов_ЕП_Sitowise |
623 | Supply of an additional set of geodetic equipment | 26.11.2021 | 1 | Leica Geosystems Oy | Протокол_итогов_ТКП-623 |
w/n | Concluding an Addendum to Contract No. FF-02-0019-18 dd. 31 May 2018 with AS "Siltumelektroprojekts" for performance of additional works as related to the subject: "3D models Development within the Detailed Design Documentation for the Hanhikivi-1 NPP”. | 26.11.2021 | 1 | AS "Siltumelektroprojekts" | Протокол_итогов_ЕП_SEP |
w/n | Conclusion of an Addendum to the Contract No. FF-01-0052-18 dd. 25 May 2018 with JSC SEM for Additional Work Consisting in Installation of the Structured Cabling System of 91UYF, 92UYF Checkpoints due to the release of FCR 20-000164 rev.1, FCR 20-000192 rev.2. | 30.11.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Conclusion of an Addendum to the Contract No. FF-01-0091-21 dd. 11 March 2021 with JSC SEM for Additional Work Consisting in Installation of Electric Lighting System in the Storage for Aggregates 91USK of the Concrete Batching Facility due to the release of FCR 20-000202 rev.2. | 30.11.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Conclusion of an Addendum to the Contract No. FF-01-0096-21 dd. 22 April 2021 with JSC SEM for Additional Work to Be Performed with Power Supply and Telecommunication Systems of the 94UYF Building. | 30.11.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
w/n | Conclusion of an Addendum to the Contract No. FF-01-0121-21 dd. 3 November 2021 with JSC SEM for Additional Electrical Installation Works to Be Performed on the 90USK, 91USU, 92USU and 99USK Buildings. | 30.11.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_АО_СЭМ |
621 | Development of the Hanhikivi-1 NPP Detailed Design Documentation | 10.12.2021 | 3 | AS "Siltumelektroprojekts" | Протокол_итогов_ЗП-621 |
631 | Execution of work on obtaining non-nuclear construction permits for Hanhikivi-1 NPP facilities in the municipality of Pyhajoki | 10.12.2021 | 1 | ART-palvelu | Протокол_итогов_ТКП-631 |
w/n | Conclusion of the Addendum to Contract No. FF-02-0025-21 dd. 2 February 2021 with Kardinal-Soft LLC for performance of additional mathematical modelling of heat discharge recirculation at Hanhikivi 1 NPP. | 10.12.2021 | 1 | Kardinal-Soft LLC | Протокол_итогов_ЕП_Кардинал-софт |
608 | Transportation and Installation of Navigation Buoy No. G1 in the Water Area of the 10UPF “Sea Supply Channel” Facility | 10.12.2021 | 1 | AS BMGS Filial | Протокол_итогов_ТКП-608 |
591 | Rendering of services for conducting of laboratory concrete mixture testing in accordance with the Program for Preliminary Testing of Concretes. | 10.12.2021 | 1 | Mitta Oy | Протокол_итогов_ЕП-591 |
634 | Supply of the vehicle Subaru OUTBACK 2,5i Touring CVT | 10.12.2021 | 3 | Rinta-Joupin Autoliike Oy | Протокол_итогов_ТКП-634 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0039-17 dd. 3 November 2017 with Veli Seppä Oy for rendering of services for snow cleaning during winter, as well as loading and removal, and application of road surfacing against ice formation. | 10.12.2021 | 1 | Veli Seppä Oy | Протокол_итогов_ЕП_FF-01-0039-17 |
w/n | Conclusion of an Additional Agreement to the Contract No. FF-01-0023-17 dated 13.02.2017 with JSC BMGS Eesti filial for the correction of the bill of work for the sea diversion channel (10UQF) due to the issue of FCR 19-000052 rev.1, FCR 19-000106 rev.1, FCR 20-000027 rev.1 and FCR 21-000115 rev.1. | 17.12.2021 | 1 | JSC BMGS Eesti filial | Протокол_итогов_ЕП_FF-01-0023-17 |
605 | Soil excavation, arrangement of soil bedding, foundation and doorstep installation for transformer substation, installation of transformer substation 94UAD | 17.12.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-605 |
572 | Performance of works on setting up a communication system of relay protection between 04UAF TS (Siemens) and 97UAD TS | 17.12.2021 | 1 | Siemens | Протокол_итогов_ЕП-572 |
w/n | Conclusion of an Additional Agreement to Contract No. FFF-01-0122-21 dated 17.11.2021 with JSC SEM to perform additional electrical installation work on buildings 93USU, 94USU, 96USK, 97USK, 98USK. | 17.12.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_FF-01-0122-21 |
w/n | Conclusion of an Additional Agreement to the Contract No. FFF-01-0053-18 dated 25.06.2021 with AS MARU EHITUS for performance of additional works on installation of ventilation and water supply pipeline, sewerage of Building 93UYA at the territory of Hanhikivi-1 NPP installation and construction base, due to the issue of FCR21-000024 rev.4, FCR19-000027 rev.5. | 17.12.2021 | 1 | AS MARU EHITUS | Протокол_итогов_ЕП_FF-01-0053-18 |
w/n | Conclusion of an Additional Agreement to the Contract No. №FF-01-0095-21 dated 24.03.2021 with JSC SEM for construction and installation works at the storage facilities of the General Contractor 90USK, 91USU, 92USU, 93USU, 94USU,95USK, 96USK, 97USK, 98USK and 99USK, due to the issue of of FCR21-000200 Rev.1, FCR21-000201 Rev.l, FCR21-000202 Rev.l, FCR21-000203 Rev.l, FCR21-000204 Rev.l, FCR21 -000205 Rev.1, FCR21-000206 Rev.l, FCR21-000207 Rev.l, FCR21-000208 Rev.l, FCR21-000209 Rev.l. | 17.12.2021 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_FF-01-0095-21 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-01-0097-21 dated 15 April 2021 with Treivan Company Oy for excavation of road ditches, base filling with crushed stone, transportation of excessive soil, construction of ramp, laying of sidewalk curbstones, marking of road lane arrows, and arrangement of pedestrian crosswalk. | 29.12.2021 | 1 | Treivan Company Oy | Протокол_итогов_ЕП_FF-01-0097-21 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-02-0045-20 dated 14 January 2021 with Pohjatekniikka for correction of the DD documentation and 3D model “Pit for Main Buildings and Structures” in accordance with the adjusted initial design data from the Customer. | 29.12.2021 | 1 | Insinodritoimisto Pohjatekniikka Оу | Протокол_итогов_ЕП_FF-02-0045-20 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-01-0109-21 dated 15 June 2021 with Maru Rakennus Oy for construction of foundations, installation of prefabricated facilities, installation of external and internal stairs and doorsteps, installation of internal networks for HVAC, water supply and drainage for administrative and on-site facility of storage facility 97UYA, and checkpoint building of storage facility 98UYF, in view of the issue of FCR21-000180 rev.1, FCR21-000175 rev.1, FCR21-000181 rev.1, FCR21-000176 rev.1. | 29.12.2021 | 1 | Maru Rakennus Oy | Протокол_итогов_ЕП_FF-01-0109-21 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-01-0113 dated 26 July 2021 with Treivan Company Oy for installation of HVAC internal networks at storage facilities 91USU, 92USU, 93USU, 94USU, 95USK, 96USK. | 29.12.2021 | 1 | Treivan Company Oy | Протокол_итогов_ЕП_FF-01-0113-21 |
635 | Works on Soil Transportation from the Hanhikivi-1 NPP Construction Site to Matinsaari Soil Storage Site | 29.12.2021 | 5 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-635 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-01-0060-19 dated 06 June 2019 with SCM Latvia for execution of construction works and installation of utility networks of structures 94UST and 93USK in view of the issue of FCR20-000084 rev.1, FCR20-000153 rev.1 and 2, FCR20-000198 rev.1 and 2, FCR21-000019 rev.1 and 2, FCR21-000057 rev.1, FCR21-000082 rev.1 and 2, FCR21-000088 rev.1, FCR21-000145 rev.1, FCR21-000156 rev.1. |
29.12.2021 | 1 | SCM Latvia | Протокол_итогов_ЕП_FF-01-0060-19 |
581.1 | conclusion of a contract with L&T YMPÄRISTÖPALVELUT OY for provision of services of wastes management, servicing of sections of networks VP-0, VP-1, VP-2 and intermediate wells, provision and servicing of portable toilets at the Hanhikivi-1 NPP construction site. | 29.12.2021 | 1 | L&T YMPÄRISTÖPALVELUT OY | Протокол_итогов_ЕП-581.1 |
625 | Performance of Works Consisting in Supply, Unloading and Installation of Boom Barriers for Access Rock Soil Storage Sites at the Territory of Hanhikivi-1 NPP Construction Site | 29.12.2021 | 3 | Veli Seppä Oy | Протокол_итогов_ЗП-625 |
w/n | Сonclusion of an Additional Agreement to Contract No. FF-01-0080-20 dated 16 October 2020 with Ab Tallqvist Infra Oy for execution of additional works to construct rocky soil storage sites 93UZH and 94UZH at the construction and installation base of the Hanhikivi-1 NPP. |
30.12.2021 | 1 | Ab Tallqvist Infra Oy | Протокол_итогов_ЕП_FF-01-0080-20 |
611 | Works Execution to Connect Storage Facilities Substation 94UAD | 28.01.2022 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-611 |
612 | Performance of Works on Arrangement of Monitoring, Control and Automation Networks for Heating and Ventilation Systems of Buildings 90USK, 99USK, 98USK, 97USK, 96USK, 94USU, 93USU, 92USU, 91USU, 97UYA, 98UYF | 28.01.2022 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-612 |
636 | Recruiting of qualified personnel for certification of the concrete batching facility | 28.01.2022 | 1 | Sikajoen Betonitukku Oy | Протокол_итогов_ЕП-636 |
590.2 | Execution of a works package to arrange power supply networks, communication networks, fire alarm of storage building 95USK. Stage 3 | 11.02.2022 | 2 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЗП-590.2 |
693 | Designer supervision works execution | 11.02.2022 | 1 | Insinööritoimisto Pohjatekniikka Oy | Протокол_итогов_ЕП-693 |
w/n | Conclusion of an additional agreement to Contract No. FF-01-0124-21 dated 19 November 2021 with Metrostav a.s. for execution of moraine handling, transportation and laying works to construct access tunnel 90UPR and rock excavation works to construct access tunnel 90UQN | 11.02.2022 | 1 | METROSTAV A.S. sivuliike Suomessa | Протокол_итогов_ЕП_FF-01-0124-21 |
107.4.2 | Performance of a Set of Works on Arrangement of Internal Power Supply Networks, Communication Networks, Fire Alarm, SCS and MCDS in 97UYA Administration and Amenity Building and 98UYA Checkpoint | 18.02.2022 | 3 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол итогов ЗП-107.4.2 |
w/n | Сonclusion of an addendum to contract No. FF-01-0008-16 dd. 01 February 2016 with Ruskon Betoni Oy for the contract’s extension and inclusion of additional services in 2022. | 10.03.2022 | 1 | Ruskon Betoni Oy | Протокол_итогов_ЕП_FF-01-0008-16_Ruskon_Betoni_Oy |
w/n | Conclusion of an addendum to contract No. FF-17-0002-21 dd. 29 December 2021 with Mitta Oy for performance of additional works under the hardened concrete testing in view of the concrete manufacturing facilities of JSC CONCERN TITAN-2. | 10.03.2022 | 1 | Mitta Oy | Протокол_итогов_ЕП_FF-17-0002-21_Mitta_Oy |
w/n | Conclusion of an addendum to contract No. FF-01-0103-21 dd. 22 April 2021 with JSC SEM for performance of additional works related to arrangement and compaction of the crushed stone layer required for secure installation of the lighting supports (up to 20 m tall) in the operating position at the General Contractor’s storage facilities. | 18.03.2022 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | ЕП_FF-01-0103-21_СЭМ |
638 | Servicing the Mobile Diesel Light Towers at the Hanhikivi 1 NPP Construction Site | 31.03.2022 | 1 | Woller Oy | Протокол_итогов_ТКП-638 |
700 | Technical consulting regarding systems of video surveillance, fire alarm, and access control | 31.03.2022 | 1 | Capcon Turvapalvelut (Capitis Control Oy) | Протокол_итогов_ЕП-700 |
w/n | Conclusion of an Addendum to the Contract No. FF-01-0119-21 dated 29 October 2021 with JSC SEM for interior rooms construction, interior rooms finishing, arrangement of fire protection of load-bearing metalwork, and arrangement of controlled drainage system for roofs of warehouses 90USK, 99USK, 98USK, 97USK, 96USK, 94USU, 93USU, 92USU, and 91USU. | 31.03.2022 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_FF-01-0119-21 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0109-21 dd. 15 June 2021 with Maru Rakennus Oy for the performance of works for arrangement of internal HVAC networks of the Administration and Amenity Building of 97UYA Storage Facilities and Checkpoint building of 98UYF Storage Facilities | 31.03.2022 | 1 | Maru Rakennus Oy | Протокол_итогов_ЕП_FF-01-0109-21 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0104-21 dd. 24 May 2021 with JSC SEM for the performance of works for arrangement of embankment, foundations, installation of modular units, arrangement of internal HVAC networks, internal and external water supply and sewage networks of 94UYF Checkpoint | 31.03.2022 | 1 | Joint Stock Company SOSNOVOBORELECTROMONTAZH | Протокол_итогов_ЕП_FF-01-0104-21 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0072-20 dd. 6 March 2020 with SCM Latvia for construction of CIB buildings of Hanhikivi 1 NPP: Pre-Installation Shop (96UST), Turbine Shop (98UST), Cylinder Warehouse (94USK), Outdoor Pre-Assembly Area (92UZC), Chief Mechanic and Chief Power Engineer′s Shops (95UST) (External Utility Networks, Steel and Reinforced Concrete Structures) | 31.03.2022 | 1 | SCM Latvia | Протокол_итогов_ЕП_FF-01-0072-20 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Finland Oy for reimbursement of expenses for the period from 1 January 2021 to 31 December 2021 to provide water supply during construction of Water Intake Structures facilities | 31.03.2022 | 1 | Skarta Finland Oy | Протокол_итогов_ЕП_FF-01-0034-17 |
w/n | Conclusion of an Addendum to Contract No. FF-01-0010-16 dd. 8 March 2016 with Eurofins Nab Labs Oy for provision of services for environmental monitoring of water in the settlement ponds, monitoring of the dust content, noise and vibration level, and monitoring of groundwater at the site | 31.03.2022 | 1 | Eurofins Nab Labs Oy | Протокол_итогов_ЕП_FF-01-0010-16 |
w/n | Conclusion of an Addendum to Contract No. FF-06-0010-16 dd. 29 July 2016 with Cramo Finland Oy for rendering of services for renting of accommodation cabins and temporary fencing. | 18.04,2022 | 1 | Cramo Finland Oy | ЕП__FF-06-0010-16_Cramo |
w/n | Conclusion of an Addendum to Contract No. FF-01-0112-21 dd. 16 July 2021 with Treivan Company Oy for reimbursement of expenses incurred for the period from 5 August 2021 to 31 January 2022 to provide power supply for the construction equipment, lighting masts and construction accommodation cabins. | 18.04.2022 | 1 | Treivan Company Oy | ЕП__FF-01-0112-21_Treivan |
w/n | Conclusion of an Addendum to Contract No. FF-01-0113-21 dd. 26 July 2021 with Treivan Company Oy for reimbursement of expenses incurred for the period from 5 August 2021 to 31 January 2022 to provide power supply for the construction equipment, lighting masts and construction accommodation cabins. | 18.04.2022 | 1 | Treivan Company Oy | ЕП__FF-01-0113-21_Treivan |
w/n | Conclusion of an Addendum to Contract No. FF-03-0023-21 dd. 15 October 2021 with Cramo Finland Oy for performance of works for refuelling of diesel heating fans with fuel and oil in buildings 93UST and 93UYA. | 18.04.2022 | 1 | Cramo Finland Oy | ЕП__FF-03-023-21_Cramo |
w/n | Conclusion of an Addendum to Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Finland Oy for reimbursement of expenses to provide temporary power supply for the period from 1 January 2021 to 31 December 2021. | 18.04.2022 | 1 | Skarta Finland Oy | ЕП__FF-01-0034-17_Skarta |
w/n | Conclusion of an Addendum to Contract No. FF-01-0023-17 dd. 13 February 2017 with JSC BMGS for reimbursement of expenses incurred due to provision of the temporary power supply during drilling and blasting operations and excavation works at facility Pit for Construction of 10UQQ for the period from 1 January 2021 to 31 December 2021. | 18.04.2022 | 1 | JSC BMGS | ЕП__FF-01-0023-17__BMGS |
w/n | Conclusion of an Addendum to Contract No. FF-01-0056-19 dd. 11 February 2019 with Takanen MR Oy for the performance of works for arrangement of external heat and water supply networks and domestic sewage networks of the General Contractor’s Storage Facilities due to issue of FCR 21-000155 rev.1; FCR 21-000157 rev.1. | 18.04.2022 | 1 | Takanen MR Oy | ЕП__FF-01-0056-19__Takanen |
w/n | Concluding an Addendum to Contract No. FF-01-0034-17 dd. 21 July 2017 with Skarta Finland Oy concerning the construction of embankments made of 0-300 mm crushed rock material during the erection of Temporary Dam of the Water Intake Facility, the construction of 0-1600 mm blasted rock ripraps during the erection of the 10UZS Breakwater, and drilling of preliminary wells during the grouting operations carried out in the course of the erection of the Dams of the 10UPC Water Intake Facility. | 06.05.2022 | 1 | Skarta Finland Oy | ЕП__FF-01-0034-17__Skarta |
w/n | Concluding an Addendum to Contract No. FF-01-0081-20 dd. 30 October 2020 with JSC BMGS for the compensation of costs relating to the provision of temporary power supply during the construction and installation work carried out in the course of the erection of the 10UPG Redundant Culvert. | 06.05.2022 | 1 | JSC BMGS | ЕП__FF-01-0081-20__BMGS |
w/n | Concluding an Addendum to Contract No. FF-01-0113-21 dd. 26 July 2021 with Treivan Company Oy for performance of work relating to the installation of internal heating, ventilation, and air conditioning services of the 91USU, 92USU, 93USU, 94USU, 95USK, and 96USK storage facilities in connection with the issuance of FCR21-000190 Rev. l; FCR22-000061 Rev. l. | 06.05.2022 | 1 | Treivan Company Oy | ЕП__FF-01-0113-21__Treivan |
w/n | Concluding an Addendum to Contract No. FF-19-0061-21 dd. 22 March 2021 with WTS Services Oy Ltd for performance of maintenance work on electrical equipment, plumbing equipment, ventilation equipment, and fire alarm system. | 06.05.2022 | 1 | WTS Services Oy Ltd | ЕП__FF-19-0061-21__WTS |