Lot № Hankinnan nimi Valintapäivämäärä Osallistujien lukumäärä Voittaja
Execution of the package of construction works for preparation of the construction base area of “Hanhikivi-1” NPP 01.07.2015 4 DESTIA LTD
2 Construction of power supply networks 20kV and fiber-optic communication line (FOCL) networks of the construction base for "Hanhikivi-1" NPP (Stage 1) 03.09.2015 5 Andament Group Ltd.
6 Dredging works of the water area of the catch basin and the quay (stage 1, 200, 000 m3) for “Hanhikivi-1” NPP 05.10.2015 4 WASA DREDGING LTD.
4 Design and survey for construction and modernization of Nuclear Power Plants on: “Hydraulic Structures: intake sea-level channel (10UPF), catch basin(10UPE), standby sea-level intake channel (10UPB), culvert (10UPG), protective dike (10UZS) for “Hanhikivi-1” NPP” (Development of DD for hydraulic structures) 13.10.2015 6 Sito Oy
8 Pit excavation for main buildings and structures. Stage 1: removal of top soil 13.10.2015 4 Andament Group Ltd.
11 Pit excavation works for main buildings and structures of “Hanhikivi-1” NPP. 11.12.2015 8 DESTIA LTD
12 Supply of concrete for construction of “Hanhikivi-1” NPP. 01.02.2016 3 Ruskon Betoni Oy
14 Environmental monitoring 08.03.2016 6 EHP Tekniikka NabLabs Oy
15 Construction of water supply and household sewage networks on construction base (Stage 2) 04.04.2016 5 Ab Tallqvist Infra Oy
30 Engineer survey for Detailed Design development. 07.04.2016 2 Geobotnia Oy
9 Supply of transformer substations (construction base) 18.05.2016 8 ABB s.r.o.
31, 32 Development of Detailed Design Documentation for Hydraulic Structures 25.05.2016 1 Sito Oy
10 Provision of services of sorting and disposal of wastes. 20.05.2016 2 Suez Suomi Oy
24 Construction of Sorted Waste Station 06.07.2016 5 Lapin Teollisuusrakennus Oy
29 Installation of lighting networks of the construction base area, Installation of networks 0,4 kV, FOCL networks, earthing networks for mobilization camp. 08.07.2016 4 Eltel Networks Pohjoinen Oy
1 Rent of Site office and canteen at the mobilization camp. 29.07.2016 2 Cramo Finland Oy
22 Development of Basic Design and Detailed Design Documentation and construction and installation works for accommodation camp of “Hanhikivi-1” NPP 25.08.2016 12 Rakennuskartio Oy
49 Geodetic network plan of "Hanhikivi-1" NPP 29.08.2016 8 Mitta Oy
27 Construction of Water Supply Pumping Station 06.10.2016 3 Suomen Maastorakentajat Oy
50 Construction dressing rooms (14 pcs. for 2600 people) at the Temporary mobilization site 19.10.2016 9 UAB “PROFILEKSAS”
25 Development of Detailed Design Documentation and construction and installation works to erect two Administrative buildings: for the Contractor (200 pers.) and the Customer (200 pers.) and a First Aid Medical Center for NPP “Hanhikivi-1” 17.11.2016 5 AS MARU EHITUS
37 Installation of transformer substation 20kV, arrangement of power supply 20kV, FOCL and External Lighting Networks at the main site for “Hanhikivi-1” NPP 10.02.2017 5 Joint Stock Company SOSNOVOBORELECTROMONTAZH
47 Construction of external discharge hydraulic structures at the aquatorium of “Hanhikivi-1” NPP 13.02.2017 8 AS BMGS Eesti filiaal
54 Construction and installation works to build a local waste treatment facility for “Hanhikivi-1” NPP 28.02.2017 2 Ab Tallqvist Infra Oy
35 Installation of transformer substation 20kV at the construction base area” for “Hanhikivi-1” NPP. 31.03.2017 3 Pluvo OÜ, Suomen sivuliike
53 Development of Detailed Design Documentation and construction and installation works to erect a canteen for 600 seats for NPP “Hanhikivi-1” 07.04.2017 7 AS MARU EHITUS
48 Protection of the pit for main buildings and facilities of "Hanhikivi-1" NPP  20.04.2017 3 DestiaLtd.
92 Installation of power supply 0,4kV for VP-2 at the site for "Hanhikivi-1" NPP 26.04.2017 1 Joint Stock Company SOSNOVOBORELECTROMONTAZH
93 Installation of power supply 0,4kV for VP-0 at the site for "Hanhikivi-1" NPP 15.05.2017 2 Joint Stock Company SOSNOVOBORELECTROMONTAZH
58 Rock soil crushing after blasting works at the "Hanhikivi-1" NPP site 25.05.2017 5 Ab Tallqvist Infra Oy
26 Development of Detailed Design Documentation of reinforcement production facility at the construction base of "Hanhikivi-1" NPP 15.06.2017 4 AS Siltumelektroprojekts
98 Supply of Measuring Equipment and Instrumentation for "Hanhikivi-1" NPP Construction Site 22.06.2017 1 Leica Geosystems Oy
100 Performance of construction and installation works for arrangement of rock soil storage area 07.07.2017 5 Ab Tallqvist Infra Oy
73 Construction of external water-intake hydraulic structures at the aquatorium of "Hanhikivi-1" NPP. 21.07.2017 4 Suomen Maastorakentajat Oy
99 Installation of 0.4kV power supply for "Hanhikivi-1" NPP 20.07.2017 3 Joint Stock Company SOSNOVOBORELECTROMONTAZH
113 Dismantling of cottages at the "Hanhikivi-1" NPP Construction Site 17.08.2017 3 Veljekset Kellola Oy
28 Arrangement of fence of “Hanhikivi 1” NPP construction and installation base 19.12.2017 2 Joint Stock Company SOSNOVOBORELECTROMONTAZH
157 Earthworks and installation of outdoor site utilities for "Hanhikivi-1" NPP facilities construction: Guard houses 91UYF 92UYF 93UYF 20.03.2018 1 Veljekset Kellola Oy
129 Construction of Access Control Point buildings 91UYF 92UYF 93UYF 94UYF 95UYF of the construction and installation base of "Hanhikivi-1" NPP 27.04.2018 9 AS MARU EHITUS
147 Arrangement of the driveways and walkways for “Hanhikivi-1 NPP” construction facilities: guard houses 91UYF 92UYF 93UYF 15.05.2018 1 YIT INFRA OY (LEMMINKÄINEN INFRA OY)
107 Performance of CIW on embankment arrangement and storage facilities ground levelling. 11.02.2019 3 Takanen MR Oy
215 Supply, assembly and installation of the furniture for the Administrative buildings 94UYA and 95UYA. 11.03.2019 7 UAB Ergolain projektai
215.1 "Supply, assembly and installation of kitchen furniture and appliances in the 94UYA and 95UYA administrative and amenity buildings" 08.05.2019 3 UAB Ergolain projektai
215.2 “Supply, assembly and installation of kitchen furniture and appliances for the 91 UYF checkpoint” 23.05.2019 1 UAB Ergolain projektai
229 Commissioning of VP-1 and VP-2 pumps 25.05.2019 1 Joint Stock Company SOSNOVOBORELECTROMONTAZH
136 “Performance of lifting operations within the territory of Hanhikivi-1 NPP (framework contract)” 10.06.2019 4 PJP Nosto Oy / E. Helaakoski Oy
148.5 Set of Works on Construction of Anti-Corrosive Treatment Shop with a Spray Cabinet (94UST), Paint Warehouse (93USK) 06.06.2019 5 SCM Latvia
243 “Services on Disposition of Personnel at Accommodation Camp” 28.06.2019 3 WTS Services Oy
248 "Soil transportation from Hanhikivi 1 NPP construction site" 09.07.2019 1 AS BMGS Filial
184 "Supply of weight station  94UZD" 19.07.2019 3 Lahti Precision Oy
96 Pit excavation for standby water outlet struсture 10UQU on the Hanhikivi 1 NPP construction site. 22.07.2019 1 AS BMGS Filial
148.8.1 Supply of cranes for reinforcement shop 25.07.2019 7 Konecranes Finland Oy
238 "Construction and Installation Works for Arrangement of Water Supply Pipeline Inlets and Drainage Outlets for Buildings 93UST, 92USN, 93UYA" 06.08.2019 3 AS MARU EHITUS
239 “Maintenance of 93UGR and 94UGR Surface Runoff Treatment Facilities and Settlement Ponds” 03.09.2019 1 Lassila & Tikanoja Plc
64.1 Concrete mixes independent laboratory tests in accordance with Preliminary concrete test program 06.09.2019 3 SGS Intron B.V.
107.1 Construction of storage facilities 91USU, 92USU, 93USU, 94USU, 97 UYA, 98 UYF, 90USK, 95USK, 96USK, 97USK, 98USK, 99USK, development of on-site and external utility networks, area fence and installation of block-modular boiler 91UTH. 13.09.2019 9 UAB BORGALITA
254 Provision of Services on Geodetic Monitoring of Geodetic Network Markers by Measurement 04.10.2019 2 Taratest Oy
272 Provision of services on assessment of justification, documental confirmation and compliance with the stated expenses amount of Ruskon Betoni Oy company related to the supply, design, installation and commissioning of two concrete facilities located in the Hanhikivi-1 NPP construction and installation base area 24.10.2019 3 TJP Consulting Oy